KEco Soil-Nail is used to improve the stability of natural slopes or artificial slopes caused by excavation, which are at high risk of collapse.
KEco Soil-Nail uses the same solid / hollow type as KEco Rockbolt, and it is easy to construct and it is possible to build a stable retaining wall by using the ground itself as a wall. In particular, it has been widely commercialized due to its superiority in safety, constructability and quality.
GFRP Soil-Nail Quality Standards
· 2016 Apr Established GFRP rock bolt specification by Korea Highway Corporation
· 2017 Aug Establishment of GFRP rock bolt quality standard by Korea Rail Network Authority and Ministry of Land, Infrastructure and Transport
* Scroll left and right to see the content
Division | Unit | Quality Standards | Remarks |
---|---|---|---|
Tensile Strength | MPa | ≥ 850 | |
Shear Strength | MPa | ≥ 150 | |
Glass Fiber Content | % | ≥ 75 | |
Minimum diameter | mm | ≥ 20 |
KEco Soil-Nail Standard Specification
· Solid Type
* Scroll left and right to see the content
Type NO. | Outer Diameter (mm) |
Ultimate Tensile Strength (MPa) |
Shear Strength (MPa) |
Glass Fiber Content (%) |
---|---|---|---|---|
SS-25 | 25 | 850 | ≥ 150 | ≥ 75 |
KEco Soil-Nail Standard Specification
· Hollow Type
* Scroll left and right to see the content
Type NO. | Outer Diameter (mm) |
Hole Diameter (mm) |
Ultimate Tensile Strength (MPa) | Shear Strength (MPa) |
Glass Fiber Content (%) |
---|---|---|---|---|---|
HS-25 | 25 | 12 | 850 | ≥ 150 | ≥ 75 |
HS-27 | 27 | 12 | 850 |
KEco Soil-Nail / Standard Specification
* Scroll left and right to see the content
KEco Solid Soil-Nail | KEco Hollow Soil-Nail | |
---|---|---|
Materials | GFRP | GFRP |
Nominal Diameter | D = 23.5mm | D = 27/12(Hole)mm |
Weight (4m) | 3.88 kg | 3.88 kg |
The tensile strength | More than 850 MPa | More than 850 MPa |
Ultimate | 37.0 ton/unit | 32.0 ton/unit |
Electrical conduction | none | none |
Durability | Approximately 100 years (corrosion resistance) | Approximately 100 years (corrosion resistance) |
Constructability |
Lightweight (4kg/4m) for easy to handle · KEco solid rock bolt can be installed by one person · KEco solid rock bolt can be installed by one person · There is almost no dropout due to its own weight when working on the end of the ceiling. · Easy to insert KEco solid rock bolt compared to steel rebar · Difficulty working in the water section |
Lightweight (4kg/4m) for easy to handle · KEco hollow rock bolt can be installed by one person · it Can be injected through a hollow hole without connecting a separate injection tube · It is possible to shorten the construction time and to fill it by 100% · Excellent effect in the work of the water section |
Stability |
· KEco solid rock bolt can be inserted by humanpower · KEco solid rock bolt can be inserted by humanpower · it is a non-conductive product, it can be used safely even in high-moisture and high-pressure sites. |
Reduced risk factors with lightweight materials and excellent workability · Stable excavation cycle management is possible by reducing worker fatigue and increasing work efficiency · Workers can check the mortar filling status by themselves · 100% filling possible (prevention of falling accidents) · Zero safety accidents by ensuring quality and minimizing risky work |